Splice Strength Test of Light Gauge Channel Steel in Modular Container House Frames

01 September 2025

Modular container houses have become a go-to for fast-build projects—from construction site dormitories to temporary disaster shelters—thanks to their quick assembly, portability, and low cost. But their safety and durability hinge on one critical component: the frame. Light gauge channel steel (often Q235 or Q345 grade, 3–5mm thick) is the backbone of these frames—it’s 20–30% lighter than standard steel, cutting transport and installation costs, while still promising enough strength to support floors, walls, and roof loads.​

light_gauge_channel_steel_modular_container_house_splice_strength_test

The catch? The frame is built by splicing lengths of channel steel together, and these splices are the “weak links” if not tested. A poorly designed splice can fail under weight (like furniture or people) or environmental stress (wind, snow), leading to frame deformation or even collapse. That’s why splice strength testing isn’t just a formality—it’s how we make sure these houses are safe to live in. We’re breaking down a real-world test of light gauge channel steel splices, from setup to results, and what it means for anyone building or using modular container houses.​

Why Light Gauge Channel Steel Fits Modular Container House Frames​

Before diving into tests, let’s clarify why this steel is a top pick. Modular frames need to be:​

Lightweight: Easy to lift with small cranes and stack for transport. A 6m-long 10# light gauge channel steel (100mm height, 48mm flange width) weighs just 12.7kg—vs. 15.6kg for a standard 10# channel steel. For a 20ft container house frame, that’s a 50kg total weight saving.​

Strong Enough: To handle typical loads: 2.0 kN/m² for floors (people/furniture), 0.5 kN/m² for roofs (snow/wind), and 1.0 kN/m² for walls (wind pressure). Q235 light gauge channel steel has a tensile strength of 375–500 MPa, which meets these demands—if splices hold.​

Easy to Splice: Its U-shaped cross-section fits bolts or welds neatly, making on-site assembly fast (a 4-person team can build a frame in 8 hours, vs. 12 hours with wood).​

But none of this matters if the splices fail. For example, a construction site in 2022 had a modular house frame sag after workers stacked boxes on the second floor—investigators found the bolted splices hadn’t been tested, and the bolts pulled through the thin steel flange. Testing prevents these risks.​

Splice Strength Test Setup: How We Mimic Real-World Loads​

To get reliable results, we tested the two most common splice methods for modular frames: bolted splices (detachable, easy to adjust) and welded splices (permanent, higher strength potential). Here’s how we designed the test:​

1. Test Samples​

We used 10# light gauge channel steel (Q235 grade, 3.5mm thick)—the most popular size for 20ft container house floor frames. We made 6 samples total: 3 bolted, 3 welded.​

Bolted Splices: Two 1.2m steel lengths joined with two M12 high-strength bolts (8.8 grade) through pre-drilled holes (13mm diameter) in the flanges. We used washers to spread pressure (prevents the bolt from tearing through the thin steel).​

Welded Splices: Same 1.2m lengths, but joined with fillet welds (6mm leg length) along both flanges and the web—this is the standard weld design for modular frames. We ground the welds smooth to avoid stress concentration.​

All samples were cleaned with a wire brush to remove rust or oil, matching real construction site conditions.​

2. Test Equipment & Parameters​

We used a universal testing machine (UTM) capable of applying up to 100 kN of axial load—enough to simulate extreme but realistic stress. We tested two key load types that frames face:​

Axial Compression: Mimics vertical loads (floor weight, people). We pushed down on the splice at a slow speed (2mm/min) to avoid sudden failure, recording the load and how much the splice deformed (displacement).​

Lateral Bending: Mimics horizontal loads (wind, side impacts). We clamped one end of the spliced steel, applied a bending load 1m from the splice, and measured how much force it took to cause permanent bending (yield strength).​

We stopped testing when:​

Bolted splices: Bolts pulled through the flange (shear failure) or the steel around the holes deformed beyond 5mm.​

Welded splices: Welds cracked or the base steel bent permanently.​

Test Results: Bolted vs. Welded Splices—Which Performs Better?​

The numbers tell a clear story about each splice’s strengths and limits. Here’s what we found:​

1. Axial Compression Test​

Splice Type​

Average Maximum Load (kN)​

Yield Displacement (mm)​

Failure Mode​

Bolted​

32.5​

3.8​

Bolt pulled through flange (hole expanded to 16mm)​

Welded​

48.2​

2.1​

Weld fillet cracked (10mm length)​

Key Takeaway: Welded splices handle 48% more axial load than bolted ones—no surprise, since welds create a continuous bond. But bolted splices deform more before failing (3.8mm vs. 2.1mm), which is a safety plus: they “give” warning before breaking, while welded splices fail more suddenly.​

For context: A 20ft container house floor frame has 8 spliced channel steels. Each carries ~5 kN of axial load under normal use—well below both splices’ maximum loads. Even with snow (adding 2 kN per splice), they’re still safe.​

2. Lateral Bending Test​

Splice Type​

Average Yield Strength (kN·m)​

Maximum Bending Displacement (mm)​

Failure Mode​

Bolted​

1.8​

12.3​

Bolt holes elongated, steel flange bent​

Welded​

2.5​

8.7​

Weld-web joint cracked, base steel bent​

Key Takeaway: Welded splices are 39% stronger in bending—critical for areas with high wind (like coastal regions). But bolted splices bend more before failing, which helps absorb wind energy without cracking.​

We also checked if the splices met industry standards: GB/T 51422-2021 (China’s modular steel house standard) requires splices to handle at least 1.5 times the design load. Both did: bolted splices handled 2.1x the design axial load, welded 3.2x.​

Real-World Application: Testing Guides a Construction Project​

A modular housing company used our test results to build 50 units for a construction site dormitory. Here’s how they applied the data:​

Ground Floors (High Load): Used welded splices for floor frames—they carry more weight (beds, storage) and need maximum strength.​

Upper Floors (Lower Load + Easy Maintenance): Used bolted splices—they’re lighter to install, and if adjustments are needed (like adding a wall), workers can unbolt and reposition the steel.​

Wind-Prone Areas (Exterior Walls): Added a third bolt to bolted splices (we tested this too—maximum axial load jumped to 40kN) to boost bending strength.​

After 1 year of use, the frames show no signs of deformation. The site manager noted: “We used to worry about splice failure, but the test data gave us confidence. We even had a heavy snowstorm last winter, and the roofs held up perfectly.”​

Common Splice Issues & How Testing Helps Fix Them​

Testing doesn’t just measure strength—it uncovers avoidable mistakes. Here are two common splice problems we found, and how to fix them:​

1. Bolted Splices: Too Loose or Too Tight​

Problem: If bolts are under-tightened, they wiggle, leading to hole wear; over-tightened, they stretch and break. In our initial tests, under-tightened bolts (torque <25 N·m) failed at 28kN—14% less than properly tightened ones (32.5kN).​

Fix: Use a torque wrench to set bolts to 30–35 N·m (for M12 8.8-grade bolts). We added this step to the test, and bolted splice strength became consistent.​

2. Welded Splices: Too Thin Welds​

Problem: Thin fillet welds (<4mm leg length) failed at 38kN—21% less than 6mm welds. Some fabricators use thin welds to save time, but it’s a false economy.​

Fix: Enforce a minimum 6mm fillet weld for 3–5mm thick channel steel. We checked weld thickness with a caliper during testing, and it became a quality control step for the housing company.​

Conclusion​

Light gauge channel steel is a game-changer for modular container houses—but its value depends on strong splices. Splice strength testing isn’t just about meeting standards; it’s about building houses that are safe, durable, and cost-effective. Welded splices offer more strength, while bolted splices offer flexibility—testing helps you choose the right one for each part of the frame.​

For builders, this means fewer callbacks and safer projects; for users, it means peace of mind knowing the frame won’t fail. As modular housing grows in popularity—especially for affordable housing and emergency shelters—splice strength testing will keep being the backbone of reliable design. It’s not just steel and bolts; it’s about making sure these houses feel like home, not a risk.